Since its establishment in 2021, Panshi Technology has forged ahead through numerous difficulties, completed basic projects in multiple fields, and solved heat dissipation problems for many enterprises, universities, medical institutions, and other organizations. Since 2024, Panshi has newly developed a liquid-cooled backplane door heat dissipation solution. So far, many customers have adopted it with remarkable results. In 2025, Panshi will continue to develop a full liquid-cooled heat dissipation solution adhering to the tenets of focused innovation and service supremacy. Stay tuned.
  • 2021
    A CERTAIN INTELLIGENT COMPUTING CENTER
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      The client, China Mobile Cooperative Intelligent Computing Center, has 30 NVIDIA A800 servers installed.

    • DEMAND CHALLENGE

      The density of a single cabinet is 10 - 15KW, and the power of the entire computer room is relatively high.

    • EQUIPMENT LIST

      15 liquid-cooled rear door cabinets, 2 sets of chillers, a water tank heat exchange system and platform software.

  • 2021
    A COMPUTER ROOM IN SUZHOU
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      Customer's high-density computing power equipment

    • DEMAND CHALLENGE

      The density of a single cabinet is 20KW, and the power of the overall computer room is relatively high.

    • EQUIPMENT LIST

      6 sets of 20KW liquid-cooled rear door cabinets, 2 sets of water chillers

  • 2024
    A CERTAIN TALENT SERVICE CENTER PROJECT
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      Small intelligent computing center, with 5 - 8 NVIDIA A100 servers placed

    • DEMAND CHALLENGE

      Build a small high - density single - point heat - dissipation computer room

    • EQUIPMENT LIST

      5 server cabinets, 2 liquid-cooled backplane doors RDHx, 40KW chiller and platform software

  • 2021
    A CERTAIN RESEARCH INSTITUTE
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      Brain Science AI Liquid-cooled Server of a certain research institute

    • DEMAND CHALLENGE

      Single cabinet with 45KW, high-density heat dissipation, intelligent management

    • EQUIPMENT LIST

      2 showrooms, with a total of 12 high - density server cabinets

  • 2021
    HIGH - DENSITY LIQUID - COOLED CONTAINER DATA CENTER
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      Small intelligent computing center, with 5 - 8 NVIDIA A100 servers placed

    • DEMAND CHALLENGE

      Build a small high - density single - point heat - dissipation computer room

    • EQUIPMENT LIST

      5 server cabinets, 2 liquid cooling backplane doors RDHx, 40KW chiller and platform software

  • 2021
    CONTAINER DATA CENTER
    DIGITAL BEIJING BUILDING INTELLIGENT COMPUTING CENTER
    • PROJECT INTRODUCTION

      Informatization Deployment at the Edge of Combat

    • DEMAND CHALLENGE

      15-day all-road-condition earthquake resistance test, convenient and safe

    • EQUIPMENT LIST

      4 server cabinets, 2 in-row air conditioners, 1 modular UPS